This work presents a lifecycle cost analysis (LCCA) framework designed to optimize long-term maintenance strategies for the seven long-span toll bridges in the San Francisco Bay Area.
These structures vary in age (13 to 87 years old) and structure type, including suspension, steel truss and concrete segmental bridges. The developed framework addresses the unique challenges of managing long-span bridges compared to conventional bridge networks and addresses the issue of maintaining and preserving the integrity of these vital transportation links. Building on tools developed previously by the FHWA, the framework integrates both bridge element and component level analysis within an Excel-based environment for ease of adaptability. It accounts for agency costs, user costs due to work zones and detours, vulnerability costs associated with various risks (including fatigue), and future backlog costs from deferred maintenance. Three investment scenarios were evaluated over a 50-year planning horizon: Spot Repair (reactive maintenance), Preservation Performance (proactive maintenance to sustain Fair or better condition) and Accelerate Rehab (intensive rehabilitation to maximize time in Good condition).
Results demonstrate that the Preservation Performance scenario achieves the most cost-effective balance of condition and expenditure. The Spot Repair approach leads to prolonged periods in Poor condition and the highest overall costs, while the Accelerate Rehab scenario requires billions in additional investment with only marginal gains in bridge performance. The work concludes that proactive maintenance significantly outperforms reactive strategies both economically and operationally. It is expected that the implementation of the Preservation Performance scenario will increase planned investments beyond the current $2.3 Billion BATA 10-Year Capital Improvement Plan (FY 2024-33). This adaptable framework, central to the inaugural 2026 Toll Bridge Asset Management Plan, serves as a practical, scalable tool for agencies managing complex, long-span bridges.
To attend, please register using the link above. All registered participants will receive joining instructions by email prior to the webinar.
If you have any questions regarding registration or access, please contact events@theiam.org.
Waleed Aleadelat
Dr. Aleadelat is an Associate and a Senior Project Manager at the Metropolitan Transportation Commission (MTC), where he leads several initiatives in infrastructure asset management with a focus on toll bridges in the San Francisco Bay Area in collaboration with the California Department of Transportation (Caltrans). He holds a PhD in Civil Engineering from the University of Wyoming, with a research focus on infrastructure management. With over a decade of combined industry and research experience, Waleed brings deep expertise in asset management, transportation data science, risk analysis, and life cycle planning. Prior to joining MTC, he served as a Project Engineer at Caltrans and as a Research Scientist at the Wyoming Technology Transfer Center. His work centers on advancing data-driven strategies to create smarter, safer, and more sustainable infrastructure systems. Dr. Aleadelat is a certified Asset Management Professional (AMP), a Member of the Institute of Asset Management (MIAM), and an appointed member of the Transportation Research Board (TRB) Standing Committee on Asset, Performance, and Risk Management.
IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Corporate Member Price
£0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
£0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
£18.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Corporate Member Price
€0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
€0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
€21.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Corporate Member Price
$0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
$0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
$24.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Corporate Member Price
$0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
$0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
$30.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
£0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
£18.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
(USD) $0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
(USD) $21.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
€0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
€24.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Member Price
(CAD) $0.00IAM Webinar - Optimized Asset Management for Long-Span Bridges in the San Francisco Bay Area - Non Member Price
(CAD) $30.00Book Now